Starting on the south wall today, Jeff prepares to lift th first log for course #7. |
|
Jeff drilling and Paul driving pins in the south log. |
Heading to the east wall next, Jeff looks over the 6th course log at the log for the 7th course being raised. |
|
Jillena cutting some rebar pins. |
Bob keeps an eye on the log as it gets lowered into position. |
|
The log is set and still secured by the chains. Next, we'll attach straps and/or the block & tackle to the ends so we can unhook the chains. |
A view from the cab of the excavator as Jeff sets the north log. |
|
Paul unhooking the chains so Jeff can back the excavator away from the house. |
All logs for the 7th course are now up, but not fully pinned. |
|
Paul guides the top end of the east log into position against the north log. |
We've been driving only two pins a each end to secure the position of the logs, then driving the remainder of the pins. |
|
On occasion, we'll have to pin half of a log, then pull a bow out of the other half before pinning the rest. This is one of the frustrations of working with crooked logs. |
Paul drives the last lateral pin for course #7. |
|
Just as they started on the south wall, Jeff drills the holes while Paul drives the pins. Course #7 complete! |
Paul driving a pin.
(click on the image to play video) |
|
|