Paul finishes wiring the porcelain light fixture at the breaker box. |
|
The finished breaker box panel, with light fixture and weatherproof outlet. |
Outside the basement, we drove in two 10ft. grounding rods. |
|
Jillena used a hoe to rake back the stone from around the perimeter so we can lower the drain tile. |
Jillena made great progress, blisters and all, finishing about half of the perimeter today. |
|
She also worked on grading the trench floor for the electric conduit to lie in, and spreading sand for the cable line bedding. |
The grounding cable leading out of the house and looping around the two grounding rods. |
|
John dumps a load of sand in the trench while Jillena spreads it around. |
A view of the finished work in the trench from the first floor level. |
|
Zooming in, you can see the meter post on the left, and the transformer vault on the right. |