7-12-08
 
 
 
Two pressure-treated 6x6 posts and a mounting panel made of pressure-treated 2x10s. This will hold our main disconnect and meter.
 
The trench dug yesterday from the meter post to the house. We've connected and glued more conduit for the electric cable that will provide service to the house.
     
 
John starts the last trench from the meter post to the transformer vault while Paul spots him.
 
John cleans up the edges near the transformer.
     
 
Now that this trench is finished, it's time to lay the last few pieces of conduit for the last section of electric cable.
 
Paul applies PVC cement to the end of one of the joints.
     
 
John fits the joints together while Paul taps the joint into place.
 
Driving one of the two grounding rods needed for the meter post.
     
 
Cutting the excess electric cable at the transformer vault.
 
Finished! We now have our electric line run from the transformer to the meter, and from the meter to the house.
<-- BACK TO LOG STRUCTURE (PAGE 2)  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.