| We usually don't tolerate lying down on the job, but Jon gets a pass. Here, he is working on stuffing batting in the front wall. Jon was part of our indoor crew.  |  | Ted shows Jeff a trick of the trade for blending the wet mortar into the dry mortar around the corners on the adjacent wall.  | 
          
            | Doug was our right-end corner man...  |  | ...while Ted was the left-end corner man.  | 
          
            | Ben (and Dave) took much of the middle section. |  | At any area  where the lath bent away from the foam board, we pushed a screw with a washer through the lath and into the foam board. This held the lath in position while the mortar set.  | 
          
            | Jon was making great progress inside, working his way up to the top of the 1st floor windows.  |  | Here's Doug working his way down the  corner.  | 
          
            | We're over half-way done at this point.  |  | John was our mixer today. | 
          
            | Our afternoon indoor crew included Paul, Matthew, William, and Alissa. |  | The entire exterior is chinked! HOORAY! |