As far as the ceiling goes, it's completely insulated now all the way down to the rafter spacer blocks over the walls, with the exception of the four incomplete bays that need to be inspected for electrical wiring. |
|
We put up as many batts in the gable ends as we could... |
...until all we had left were batts that had wet centers. |
|
By evening, this is what we had left to do on the rear wall. |
This is what was left to complete on the front wall. |
|
Here's the next loop in the basement ceiling. Only a few more left. |