11-9-09
 
 
To get the stain to dry faster, we moved all of the sashes and frames outside to be exposed to the sun and moving air.
Bob taping off a sash in one of the double-wide windows.
     
 
Later in the evening, Bob and Jeff brought everything back inside. The stain was still quite damp.
After Bob left, Jeff continued working on disassembling a few more windows.
<-- BACK TO CONSTRUCTION (Windows)  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s