1-23-10
 
 
The first of two twin double-hungs in the living room.
Working on this first 2nd floor window was awkward from the scaffold decks. Here Jeff is planing the header log while standing on the sill log and scaffold.
     
 
By evening, we had the 2nd floor window casing in.
Not long after, the window was shimmed and installed.
<-- BACK TO CONSTRUCTION (Windows)  

BACK TO OUR LOG HOME MAIN PAGE