10-10-09
 
 
We borrowed this concrete saw to straighten out the rough edges of the interior footer pads, which should make it easier to fit the insulation around them. The hose was for a water supply to lubricate the blade and keep the dust down.
The results on one of the smaller pads. Just enough was taken off to make straighter edges.
     
 
Once the pads were trimmed up, Jeff started laying the first rows of insulation, beginning at the front wall.
A lot of time and careful scribing were necessary to make the panels fit around the pads, even with the trimmed-up edges.
     
 
A look at the scribing done around the entire pad in the previous picture.
The front third is almost finished.