Our drain outlet seems to be working well, so Jeff covered the pipes with more stone, then laid pieces of driveway fabric over everything, then covered that with more stone. |
|
Our 2" foam board only came in 2x8s, and we need about 100 pieces. The supplier had a full unit of 96 pieces already shrink-wrapped, so we got that along with 4 additional pieces.. This looked pretty strange riding in the back of a pickup truck. |