9-27-09
 
 
Jeff washing the east third of the front wall and Paul finishing off the last of the rake trim.
The wagon could only get so close to the house. For the upper logs, Jeff stood on the very edge of his platform, and reached out with the wand one-handed.
     
 
Paul does some custom cutting on the end of the trim that will match up to the end of the drip edge.
Finished! All of the rake trim is now installed, and the entire front wall is washed.
     
 
The inside crew has filled in most of the sump corner with stone.
The guys also got into the mud and installed our 3-way drain connector which joins the two draintile lines and the sump outlet.
     
 
We also boarded up the windows, in preparation for pouring the concrete floor in a few weeks.
Later in the evening, fog settled in over the fields.
     
 
After our weekend crew headed for home, Jeff stayed and hung a few more shelves to get things off the floor.
Good thing we didn't snap off our form ties. With our things off the floor now, we'll be able to more accurately level the stone.
<-- BACK TO CONSTRUCTION (FLOOR & ROOF)  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s