Jeff washing the east third of the front wall and Paul finishing off the last of the rake trim. |
|
The wagon could only get so close to the house. For the upper logs, Jeff stood on the very edge of his platform, and reached out with the wand one-handed. |
Paul does some custom cutting on the end of the trim that will match up to the end of the drip edge. |
|
Finished! All of the rake trim is now installed, and the entire front wall is washed. |
The inside crew has filled in most of the sump corner with stone. |
|
The guys also got into the mud and installed our 3-way drain connector which joins the two draintile lines and the sump outlet. |
We also boarded up the windows, in preparation for pouring the concrete floor in a few weeks. |
|
Later in the evening, fog settled in over the fields. |
After our weekend crew headed for home, Jeff stayed and hung a few more shelves to get things off the floor. |
|
Good thing we didn't snap off our form ties. With our things off the floor now, we'll be able to more accurately level the stone. |