9-6-09
 
 
After rotating the basket and panel rack around 180 degrees, we were ready to start lifting panels again.
For this side, the forklift could stay close to the house and just back up as we progressed across the roof.
     
 
LouElla waits for the delivery of another lower panel. For these, we had to get the basket within a foot or so of the eave so LouElla could get in and install the foam strip under the bottom edge of the panel.
While in the basket, LouElla checks the overhang to make sure the panels are staying fairly square with the eave line.
     
 
Our forklift driver-in-training.
Good thing they're not moving. He'd be all over the road!