After rotating the basket and panel rack around 180 degrees, we were ready to start lifting panels again. |
|
For this side, the forklift could stay close to the house and just back up as we progressed across the roof. |
LouElla waits for the delivery of another lower panel. For these, we had to get the basket within a foot or so of the eave so LouElla could get in and install the foam strip under the bottom edge of the panel. |
|
While in the basket, LouElla checks the overhang to make sure the panels are staying fairly square with the eave line. |
Our forklift driver-in-training. |
|
Good thing they're not moving. He'd be all over the road! |