12-11-10

Ted brought his laser level so he and Bob could mark the height of the 2nd floor on the walls and posts. This gives us a good idea where the top of the beams will hit the log walls and help us decide how to install hangar brackets. Meanwhile outside, Dave, Jim, and Jeff were milling the rest of the beams and kerf-cutting the ends.